Weekly Construction Update May 31

road construction

Washington County

I-15, Black Ridge to the Iron County Line

Contract: W.W. Clyde & Co.

Amount: $17,338,995

Location: Between the Toquerville and New Harmony exits.

Impact: * Single lane closures both directions at the New Harmony Exit after Memorial Day.

* Lane shifts to accommodate paving and grading.

Activity: * Paving southbound lanes from mileposts 34 to 42

* Bridge deck repairs at Exit 42.

* Excavation and ramp work near Exit 36.

* Sub-grade work on the northbound outside lane.

 

I-15, Dixie Drive Interchange

Contract: Washington County Constructors

Amount: $52,549,452

Location: St. George (Mileposts 5 – 6)

Impact: * Two lanes of traffic remain open in both directions.

* All exits are open.

* Speed is reduced to 55 m.p.h.

* Northbound traffic has been shifted to the southbound side of the interstate near the Santa Clara bridge.

* Traffic lanes have been shifted on Hilton Drive.

* The Hilton Drive Trail is closed.

Activity: * Paving.

* Retention walls west of I-15.

* Structural preparation for the future southbound on-ramp.

* Hilton Drive box culvert concrete work.

* Flood debris removal and dredging.

* Electrical line work.

http://www.udot.utah.gov/i15dixie/

S.R. 212, Telegraph Street

Contract: Interstate Rock Products

Amount: $5,515,140

Location: City of Washington, 500 West to 300 East

Impact: * Beginning at 8 p.m. nightly lane restrictions from 300 W to Green Springs Drive.

* Beginning at 8 p.m. nightly lane restrictions from Telegraph to Middleton Drive.

* Temporary intersection alteration and flagging operations.

* Traffic lanes weave through the project.

* Reduced speeds.

* One lane of traffic in each direction.

* Sidewalk closures.

Activity: * Sealing the road underneath the I-15 Exit 10 overpass.

* Resurfacing the road at the Green Springs – Telegraph Intersection.

* Storm drain installation.

* Road widening.

* Retaining wall installation near 400 West.

* Utility work and landscaping.

 

S.R. 59, Arizona State Line to Apple Valley

Contract: A-T Asphalt Paving

Amount: $1,998,101

Location: Mileposts 0 to 11

Impact: * Oversized loads restricted.

* Pilot car operations with delays of up to 15 minutes.

Activity: Setting up traffic control and project equipment.

 

S.R. 9, 300 West To 800 North Hurricane

Contract: Interstate Rock Products

Amount: $10,203,871

Location: Hurricane City State Street

Impact: Expect single lane closures.

Activity: * Manhole work.

 

Southern Parkway Advanced Traffic Management

Contract: Transcore ITS

Amount: $370,674

Location: S.R. 7 Mileposts 0 to 7

Impact: No traffic impacts.

Activity: Fiber optic installation, junction boxes, camera foundations.

Free News Delivery by Email

Would you like to have the day's news stories delivered right to your inbox every evening? Enter your email below to start!

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.