UDOT

I-15, Black Ridge to the Iron County Line

Contract: W.W. Clyde & Co.

Amount: $17,338,995

Location: Between the Toquerville and New Harmony exits.

Impact: * Lanes shift to accommodate work in the median.

* Single lane closures in the event of bridge deck repairs.

* Potential single lane closures and reduced speeds in the southbound lanes Monday through Friday from 7:00 p.m. to 11:00 a.m.

Activity: * Potential bridge deck repairs.

* From milepost 33 to 42 the contractor is installing new fence.

* Workers are installing conduit from mileposts 35 to 37.

* Heavy equipment operators are excavating and moving material in the median and shoulders adjacent to northbound lanes at mileposts 34 through 38.

* Retention wing walls are being erected under the structure at Exit 36.

* Workers are replacing parapets at the Exits 40 and 42.

* A box culvert is being extended at milepost 42.  .

 

I-15, Dixie Drive Interchange

Contract: Washington County Constructors

Amount: $52,549,452

Location: St. George (Mileposts 5 – 6)

Impact: * Two lanes of traffic remain open in both directions.

* All exits are open.

* Speed is reduced to 55 m.p.h.

* Northbound traffic has been shifted to the southbound side of the interstate near the Santa Clara bridge.

* Motorists should use caution near the Bluff Street Interchange merge lanes.

* Traffic lanes have been shifted on Hilton Drive.

* The Hilton Drive Trail is closed.

Activity: * Bridge deck work over Convention Center Drive and the new northbound I-15 bridge over the Santa Clara River.

* Structural preparation for the future southbound on-ramp.

* Completing retention walls for current construction phase.

* Drainage work at Hilton Drive.

* Flood debris removal and dredging.

http://www.udot.utah.gov/i15dixie/

S.R. 212, Telegraph Street

Contract: Interstate Rock Products

Amount: $5,515,140

Location: City of Washington, 500 West to 300 East

Impact: * Traffic shifts to the south side of the road.

* Reduced speeds.

* One lane of traffic in each direction.

Activity: * Box culvert installation.

* Storm drain installation from 300 West to 300 East.

* Removing curb and gutter.

* Road milling on the north side of the road from 300 West to 100 West.

 

S.R. 9, 300 West To 800 North Hurricane

Contract: Interstate Rock Products

Amount: $10,203,871

Location: Hurricane City State Street

Impact: From 100 East to 800 North, traffic runs one lane on each side of the road, leaving the inside lanes closed to accommodate work on the center islands.

Activity: * Workers are building island medians and working on associated landscaping and enhancements.

* Final pavement remains.

 

Free News Delivery by Email

Would you like to have the day's news stories delivered right to your inbox every evening? Enter your email below to start!

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.